Common questions about residential and commercial projects, plus a visual guide to permitted development.
Residential questions
Can’t find your answer? Call 020 3129 9374 or send us a message.
Do I need planning permission for my extension?
Many single-storey rear extensions, loft conversions and garage conversions can be built under permitted development. Two-storey side extensions, work on flats, and most work in conservation areas need planning permission. Our visual guide below explains the main limits.
What is a Lawful Development Certificate?
A certificate from your council confirming that a proposal is lawful permitted development. It is optional, but gives certainty for you, your buyers and their lenders. We can prepare and submit the application.
Do I need building regulations approval?
Almost always for extensions, loft conversions and garage conversions — even when planning permission is not needed. We prepare the building regulations drawings and specifications.
Do I need an architectural consultant and an engineer?
For structural changes, extensions or new builds, yes. They make sure the design is functional, compliant and attractive, and help you through planning and building regulations.
How long does the process take?
Typically 1–2 weeks for concept design, 8–10 weeks for planning approval and 2–4 weeks for technical drawings. Build time depends on the scope of work.
Will I need a party wall agreement?
If your work affects a shared wall or involves excavation near a neighbour’s foundations, notices under the Party Wall etc. Act 1996 are likely to be needed before work starts.
How much do your services cost?
Fees depend on scope and complexity. We offer fixed-fee packages and give a tailored quote on request.
Can you manage the entire project?
Yes. We can coordinate contractors, engineers, inspectors and consultants through to the completion certificate.
Commercial questions
Can’t find your answer? Call 020 3129 9374 or send us a message.
Do commercial extensions need planning permission?
In most cases, yes. Some limited permitted development rights exist for certain commercial premises, so we check your site and the rules that apply before recommending a route.
Can you prepare building regulations drawings for commercial premises?
Yes — technical drawings and specifications for building control, coordinated with structural engineers and other consultants.
Can you advise on a change of use?
Ask us about your building and plans. We can advise whether planning permission or prior approval is likely to be needed and prepare the application.
What do you need from us to give a quote?
The site address, a short description of the work, photos, and any existing drawings or previous planning decisions you have.
How are fees set for commercial projects?
We give a fixed-fee quote based on the scope, size and complexity of the project.
Can you manage the project through to completion?
Yes. We can coordinate contractors, engineers, inspectors and consultants through to sign-off.
Visual guide for homeowners
What can you build without planning permission?
Permitted development rights let you extend or alter a house in England without a planning application, within set limits. Here is how to tell whether your project is likely to qualify.
Four questions to ask
Is it a house?
Flats and maisonettes do not have householder permitted development rights — extensions to them need planning permission.
Are rights restricted?
Check for a conservation area or other designated land, a listed building, an Article 4 direction or a planning condition.
Is it within the limits?
Size, height, position and materials must stay within the rules — counted from the original house.
The outcome
Yes to all: likely permitted development — consider a Lawful Development Certificate.
No to any: a householder planning application is likely to be needed.
How deep can a single-storey rear extension go?
Measured from the rear wall of the original houseMaximum height 4 m. Eaves no higher than 3 m within 2 m of a boundary. The prior approval route is not available on designated land; neighbours are notified and can comment.
| Project | Key limits | Typical route |
|---|---|---|
| Single-storey rear extension | Up to 3 m deep (semi / terrace) or 4 m (detached); max 4 m high | Usually PD |
| Larger single-storey rear extension | Up to 6 m (semi / terrace) or 8 m (detached) — not on designated land | Prior approval |
| Two-storey rear extension | Max 3 m deep and at least 7 m from the rear boundary; roof pitch to match | Usually PD |
| Single-storey side extension | Max 4 m high and no wider than half the original house — not on designated land | Usually PD |
| Two-storey side extension | Not permitted development | Planning permission |
| Loft conversion / rear dormer | Within 40 m³ (terrace) or 50 m³ (semi / detached); rear slope; set back 20 cm from eaves | Usually PD |
| Hip-to-gable enlargement | Counts toward the same 40 / 50 m³ volume allowance | Usually PD |
| Front dormer facing the road | Roof extensions cannot go beyond the slope of the principal elevation fronting a highway | Planning permission |
| Garage conversion (internal) | Internal works only, no enlargement, and no condition requiring parking | Usually not needed |
| Balcony, roof terrace or veranda | Not permitted development (a Juliet balcony normally is) | Planning permission |
Rules for every extension
- Extensions and outbuildings cover no more than half the land around the original house
- No higher than the highest part of the existing roof, or the existing eaves
- Exterior materials look similar to the existing house
- Not forward of the principal elevation, or a side elevation facing a road
- No verandas, balconies or raised platforms
- No exterior cladding on designated land
When planning permission is required
- The property is a flat or maisonette
- It is in a conservation area, National Park, National Landscape (AONB), the Broads or a World Heritage Site — rules are tighter
- It is a listed building — listed building consent is also needed
- An Article 4 direction or planning condition has removed permitted development rights
- Your design goes beyond any of the size, height or position limits
- Any side extension of more than one storey
Guidance only. This is a simplified summary of permitted development for houses in England. Building regulations approval is needed separately for most extensions and conversions, and the Party Wall etc. Act 1996 may apply. Always check with your local planning authority — we can confirm the right route for your home.
Check my projectPlanning an extension or new build?
Tell us about your property and we will come back with ideas, a timeline and a fixed-fee quote.