FAQ & planning guide

Answers before you start

Common questions about residential and commercial projects, plus a visual guide to permitted development.

Residential questions

Can’t find your answer? Call 020 3129 9374 or send us a message.

Do I need planning permission for my extension?

Many single-storey rear extensions, loft conversions and garage conversions can be built under permitted development. Two-storey side extensions, work on flats, and most work in conservation areas need planning permission. Our visual guide below explains the main limits.

What is a Lawful Development Certificate?

A certificate from your council confirming that a proposal is lawful permitted development. It is optional, but gives certainty for you, your buyers and their lenders. We can prepare and submit the application.

Do I need building regulations approval?

Almost always for extensions, loft conversions and garage conversions — even when planning permission is not needed. We prepare the building regulations drawings and specifications.

Do I need an architectural consultant and an engineer?

For structural changes, extensions or new builds, yes. They make sure the design is functional, compliant and attractive, and help you through planning and building regulations.

How long does the process take?

Typically 1–2 weeks for concept design, 8–10 weeks for planning approval and 2–4 weeks for technical drawings. Build time depends on the scope of work.

Will I need a party wall agreement?

If your work affects a shared wall or involves excavation near a neighbour’s foundations, notices under the Party Wall etc. Act 1996 are likely to be needed before work starts.

How much do your services cost?

Fees depend on scope and complexity. We offer fixed-fee packages and give a tailored quote on request.

Can you manage the entire project?

Yes. We can coordinate contractors, engineers, inspectors and consultants through to the completion certificate.

Visual guide for homeowners

What can you build without planning permission?

Permitted development rights let you extend or alter a house in England without a planning application, within set limits. Here is how to tell whether your project is likely to qualify.

Four questions to ask

1

Is it a house?

Flats and maisonettes do not have householder permitted development rights — extensions to them need planning permission.

2

Are rights restricted?

Check for a conservation area or other designated land, a listed building, an Article 4 direction or a planning condition.

3

Is it within the limits?

Size, height, position and materials must stay within the rules — counted from the original house.

4

The outcome

Yes to all: likely permitted development — consider a Lawful Development Certificate.

No to any: a householder planning application is likely to be needed.

How deep can a single-storey rear extension go?

Measured from the rear wall of the original house
Semi-detached / terraced
3 m
Permitted development
6 m
With prior approval from the council
Detached house
4 m
Permitted development
8 m
With prior approval from the council

Maximum height 4 m. Eaves no higher than 3 m within 2 m of a boundary. The prior approval route is not available on designated land; neighbours are notified and can comment.

At a glance: common residential projects
ProjectKey limitsTypical route
Single-storey rear extensionUp to 3 m deep (semi / terrace) or 4 m (detached); max 4 m highUsually PD
Larger single-storey rear extensionUp to 6 m (semi / terrace) or 8 m (detached) — not on designated landPrior approval
Two-storey rear extensionMax 3 m deep and at least 7 m from the rear boundary; roof pitch to matchUsually PD
Single-storey side extensionMax 4 m high and no wider than half the original house — not on designated landUsually PD
Two-storey side extensionNot permitted developmentPlanning permission
Loft conversion / rear dormerWithin 40 m³ (terrace) or 50 m³ (semi / detached); rear slope; set back 20 cm from eavesUsually PD
Hip-to-gable enlargementCounts toward the same 40 / 50 m³ volume allowanceUsually PD
Front dormer facing the roadRoof extensions cannot go beyond the slope of the principal elevation fronting a highwayPlanning permission
Garage conversion (internal)Internal works only, no enlargement, and no condition requiring parkingUsually not needed
Balcony, roof terrace or verandaNot permitted development (a Juliet balcony normally is)Planning permission

Rules for every extension

  • Extensions and outbuildings cover no more than half the land around the original house
  • No higher than the highest part of the existing roof, or the existing eaves
  • Exterior materials look similar to the existing house
  • Not forward of the principal elevation, or a side elevation facing a road
  • No verandas, balconies or raised platforms
  • No exterior cladding on designated land

When planning permission is required

  • The property is a flat or maisonette
  • It is in a conservation area, National Park, National Landscape (AONB), the Broads or a World Heritage Site — rules are tighter
  • It is a listed building — listed building consent is also needed
  • An Article 4 direction or planning condition has removed permitted development rights
  • Your design goes beyond any of the size, height or position limits
  • Any side extension of more than one storey

Guidance only. This is a simplified summary of permitted development for houses in England. Building regulations approval is needed separately for most extensions and conversions, and the Party Wall etc. Act 1996 may apply. Always check with your local planning authority — we can confirm the right route for your home.